Practical 9 Magic Weapons for Comprehensive Cabling Engineering

2023-05-10 15:16 Author:ctc


The integrated wiring of a building is a relatively complex project, and the quality of the project directly affects the performance of the network link. During the implementation of the project, the following points need to be paid attention to.


1.The integrated wiring of a building is a relatively complex project, and the quality of the project directly affects the performance of the network link. During the implementation of the project, the following points need to be paid attention to.

 

2.If conditions permit, the weak current should go through its own weak current well to reduce the chance of electromagnetic interference. The floor wiring room and the main engine room should be arranged as large as possible to prepare for development and maintenance. For the network, the laying of the physical layer is crucial because it is the foundation.

 

3.Spread as many points as possible, use a double-hole panel (one for voice, one for data), coordinate well with electricity, and place power points near the information points. Since the integrated wiring is generally a one-time project, it is relatively difficult to change the wiring after the wiring is completed, and with the development of more and more communication equipment, it is safer to lay more.

 

4.Don't over-idealize the integrated wiring, and don't integrate some more dedicated networks into the integrated wiring. It is enough for integrated wiring to integrate telephone network, computer network and building automation network together.

Although some networks can also be integrated, it is actually better to let it form a network by itself. For example, the monitoring system, the current more advanced network monitoring system, you can use Category 5 cables to transmit audio and video, but it is not necessary to integrate it.

 

5.With the rapid development of network equipment, the choice of scheme should be as broad as possible. Horizontal use of Category 5 or above ensures that data and voice can be interchanged. Vertical use of optical fiber to increase logarithmic cables. For some buildings with many points, optical fiber should be used for data backup instead of cables.

 

6.As the price of optical products continues to drop, more light spots should be considered for large-bay wiring, which is beneficial to network construction.

 

7.When laying the DG pipe, use the one with a larger diameter and leave a margin. Pay special attention to the turning radius when laying optical cables. If the turning radius is too small, it will cause serious loss of the link. Carefully check each optical cable, especially the panel box of the optical contact point. Some panel boxes are not deep enough.

 

8.With the price reduction of optical fusion splicing equipment, where conditions permit, the traditional ST and SC head production methods can be considered, and the method of fusion splicing pigtails and optical fibers can better ensure the quality of the optical path.

 

9.Don't one-sidedly pursue the brand of wiring products. In the past few years, in fact, the performance of unshielded wires, optical cables, modules and other network equipment produced by some domestic manufacturers has reached the industry standard, and the price has a greater advantage, so we can consider using our own products.

 

The above points are frequently encountered problems in engineering. In fact, integrated wiring is not an incomprehensible project. As long as you understand its principle and compare product performance more often, you will be able to make a cheap and high-quality system. 


icon-a11,icon-a12

communicate

Tel:0755-83236763

Email:vp@ctc-ic.com

icon-a21,icon-a22,

Inventory

Log in
Email      
Password
Sign up
Register
Company
Email      
Phone     
Password